Construction work continues on north New Circle Road.
Here’s what’s new for December 15 – 19.
- Blasting work will be in effect for New Circle Road (both inner and outer loops) and Old Frankfort Pike. The mobile operation with traffic stops is scheduled for approximately 9:00 a.m., 10:30 a.m., 12:00 p.m. (noon) and 1:30 p.m. Each traffic stoppage will last approximately 15 minutes.
- Lexington Police will be assisting with traffic control during the operations.
- NOTE: A reduced speed limit of 45 MPH will be in effect at all times.
Motorists are advised to utilize side streets in lieu of traveling on New Circle Road to avoid delays.

Facebook
Twitter
Instagram
YouTube
RSS