Here’s an New Circle Road/KY 4 construction update from the Kentucky Transportation Cabinet, Department of Highways.
Starting Thursday, August 13 through Thursday, August 20 from 9am to 3pm demolition operations will be in effect for the Alexandria Drive Bridge on the inner loop of New Circle Road. Traffic will be stopped on Alexandria Drive for 15 minute intervals. The work is necessary to remove the existing structure for construction of a new inner loop bridge.
There will not be any demolition activity on Saturday or Sunday.
A 45 mph speed limit remains in effect for the construction zone.
Facebook
Twitter
YouTube
RSS