
On Sunday, February 23, from 6:00 a.m. to 10:00 p.m., Main Street in Lexington will have several lane closures. These closures are needed to remove and install rooftop equipment at the Triangle Center.
Lane closures will begin on E Main St at N Martin Luther King Blvd and end on W Main St at Broadway. The following lanes will be tapered:
- Right lane blocked from Main St/MLK to Main St/Upper.
- Right and middle lanes will be blocked from Main St/MLK to Main St/Upper.
- Traffic will be diverted to the left turn lane from Main St/Mill St to Main St/Broadway.





Facebook
Twitter
Instagram
YouTube
RSS